Remodel Project: Edward Jones in New Burn, NC

In October 2015, Buildrite was awarded an Edward Jones renovation project in New Burn, North Carolina. Having already done over 50 buildouts for this financial advisory firm in the last year, Edward Jones specifically sought out Buildrite’s help in developing brand consistency across their many locations.

Project Breakdown

  • Project Type: Tenant uplift
  • Location: New Burn, North Carolina
  • Size: 1500 sqft
  • Project Duration: 3½ weeks
  • Services: interior buildout with scope consisting of demolition, drywall, ceilings, flooring, painting, HVAC and electrical
  • Vision: Edward Jones sought brand consistency across locations with the same level of excellence without the hassle of hiring multiple contractors.
By working with Buildrite, a national general contractor, Edward Jones was able to maintain a high-quality finished product across multiple branch locations. Buildrite completed the project as quickly as possible by working around the clock, even after encountering a mold problem that halted the project for several months. After project completion, Buildrite continued to monitor the project to ensure Edward Jones was entirely satisfied with their services. [Best_Wordpress_Gallery id="3" gal_title="Edward Jones Remodel"]   [blue-quote]